Wednesday, November 3, 2010

Aug - Sep 2010

I have not had a lot of time to spend on my layout with the new baby on the way and all but here are some pics in any case.

Construction of the level crossing in the corner at Wildwood has started. I used extruded foam that I cut into 1mm sheets for the road surface. I gave it a black base coat for starters and landscaped the sides with drywall mud.

The second coat was grey and after it dried i started scribing the lines into the foam. I used curved track sets to scribe the curved lines and to cut the center piece of foam.






No comments:

Post a Comment