I started on the delivery pits but I still need to install the pit screens between the tracks.
I used pink foam to build the off loading area and used Tamiya deck tan and light grey for the paint job. I still need to paint the sides and do some weathering on it.
Showing posts with label Construction. Show all posts
Showing posts with label Construction. Show all posts
Thursday, November 20, 2014
Tuesday, November 18, 2014
Shore Fertilizers update
I have done some more work to the tanker loading dock at Shore fertilizers.
The base and the hut are made from pink foam that has been cut into sheets that are 2mm thick and then scribed with a pencil. I use these sheets for a lot of my projects. I'll start work on the pipes next.
Sunday, November 16, 2014
Construction update
I have been doing some work on Date City in the last week or two most of it has been power bus and feeder wires but there is also a mock up of the freight house on the team track.
Saturday, January 4, 2014
Thursday, January 3, 2013
Last Peninsula
I have started work on the bench work between Plant City and Yeoman yard.
The track elevation drops from 42” to 40” here.
Bench work here is 9mm ply with 25mm extruded foam on the Plant City side.
The track elevation drops from 42” to 40” here.
Sunday, December 9, 2012
Devil’s Creek Sawmill makes some progress.
Wednesday, May 30, 2012
April 2012
I’m still working on the same part of the layout.
I only have 1.5 inches between the backboard and the last rail so I have shaped some extruded foam to form some scenery up against the back board.
Here is where the level crossing goes.
I have started some scenery here.
Tuesday, July 12, 2011
Monday, July 11, 2011
Thursday, July 7, 2011
Thursday, November 4, 2010
Oct 2010
Subscribe to:
Posts (Atom)























