I started on the delivery pits but I still need to install the pit screens between the tracks.
I used pink foam to build the off loading area and used Tamiya deck tan and light grey for the paint job. I still need to paint the sides and do some weathering on it.
Seaboard Air Line Wildwood Div
Freelance Ho Scale Railroad
Thursday, November 20, 2014
Tuesday, November 18, 2014
Shore Fertilizers update
I have done some more work to the tanker loading dock at Shore fertilizers.
The base and the hut are made from pink foam that has been cut into sheets that are 2mm thick and then scribed with a pencil. I use these sheets for a lot of my projects. I'll start work on the pipes next.
Sunday, November 16, 2014
Construction update
I have been doing some work on Date City in the last week or two most of it has been power bus and feeder wires but there is also a mock up of the freight house on the team track.
Subscribe to:
Posts (Atom)